Case studies
Brinker solutions have been proven to create huge value for operators in numerous applications.
Well Integrity
- Injector well reinstated in 12 hours view case study
- $20,000/day production well reinstated following 6 hour operation view case study
- WAG reinstated in 6 hours view case study
- 12-hour reinstatement for $20,000/day production wellview case study
- WAG reinstated in 12 hoursview case study
Wellhead Leaks
- Additional $100,000/day production view case study
- 12 hours of production platform shutdown saved view case study
- Platform shutdown costing in excess of $5,000,000 avoided view case study
- Wellhead seal leaks repaired as they are diagnosedview case study
- Multiple wellhead seals are repaired in 5 hours view case study
- Double barrier isolation restored in 45 minutesview case study
Specialised Engineering Solutions
- Leak located on 22km North Sea umbilical view case study
- Leak located on a 121km umbilical view case study
- Cell fill line sealed in critical timescale view case study
